Latest News

Chassis Update 05/10

Chassis Progress 12/09

Since the last update, the chassis has been completed, with only small mounts left to be added. The finished chassis came together just after Christmas, then suspension and engine mounts were added. The complete frame weighed in at 30kg, with mounts, an decrease of 8kg over last year.
The process of welding the chassis continued, with a number of different jigs being used:


With the frame complete, the suspension mounts had to be added. These were set at angles specified by the suspension team and welded to the frame.

And then engine mounts.

The next stage for us is to paint the chassis once the final mounting points are on, and then assemble the car

Featured Image

7.jpg
Media Gallery - 2009 Launch Event
Category List
93ca
93ca
Image Detail Image Download
car 1
car 1
Image Detail Image Download
dsc01583
dsc01583
Image Detail Image Download
dsc01584
dsc01584
Image Detail Image Download
m1ts launch 10th june 2009 001
m1ts launch 10t...
Image Detail Image Download
m1ts launch 10th june 2009 002
m1ts launch 10t...
Image Detail Image Download
m1ts launch 10th june 2009 003
m1ts launch 10t...
Image Detail Image Download
m1ts launch 10th june 2009 004
m1ts launch 10t...
Image Detail Image Download
m1ts launch 10th june 2009 005
m1ts launch 10t...
Image Detail Image Download
m1ts launch 10th june 2009 006
m1ts launch 10t...
Image Detail Image Download
m1ts launch 10th june 2009 007
m1ts launch 10t...
Image Detail Image Download
m1ts launch 10th june 2009 008
m1ts launch 10t...
Image Detail Image Download
m1ts launch 10th june 2009 009
m1ts launch 10t...
Image Detail Image Download
m1ts launch 10th june 2009 010
m1ts launch 10t...
Image Detail Image Download
m1ts launch 10th june 2009 011
m1ts launch 10t...
Image Detail Image Download

 

Display Num 
« StartPrev123NextEnd »
Page 1 of 3
 

 

Phoca Gallery